Ron Powers, Ron Fryer, and Mike Stacey walking the property. April 2016
2025 Groundbreaking with family and board members. June 2025
Trees being removed before construction. March 2026
The Founders featured in the Columbian. April 2026
The location required oversized storm drainage pipes to be installed. The 14′ deep trench was excavated. April 2026
Installing large underground pipes to provide reliable stormwater drainage. May 2026
The newly installed storm drain pipes have been covered with fill, and the surrounding area is being backfilled as construction progresses across the site. June 2026
The storm drain installation is complete in this area, and the excavated ground is being backfilled and graded to prepare the site for construction of Veterans Village. July 2026
Sewer pipes and fittings are delivered and staged for installation. August 2026
Sewer pipes and connections are assembled and installed in the excavated trench. September 2026
The sewer line and access connections are installed as the underground infrastructure nears completion. September 2026